MANUFACTURING BLOG
Product Development and Manufacturing Blog
Guides on DFM, injection mold tooling lead times, materials, IP protection and working with a Shenzhen contract manufacturer, written by the Threegon Team in Hong Kong and Guangming, Shenzhen.
Getting Started · China Manufacturing · Doing More of the Right Thing
-
How China’s VAT works for an OEM manufacturer
Threegon Team
Why tax paid on raw materials is refunded only when we export — and why we can’t take an overseas order and deliver it straight to your customer in China.
-
NDA and OEM-Only Manufacturing: What Buyers Should Expect
Threegon Team
NDA timing, OEM-only behaviour, file access limits and why tooling ownership belongs in the manufacturing agreement — not in sales chat.
-
Factory Audit Questions for ISO 9001 and ISO 13485 Suppliers
Threegon Team
A buyer’s question list for auditing ISO 9001 and ISO 13485 plastic OEMs: certificate scope, floor controls, subcontracting and retailer responsible-sourcing context.
-
Injection Mold Tooling Lead Times: 4–6 Weeks vs 6–10 Weeks
Threegon Team
Which tooling band fits your project: 4–6 weeks to T0 for simpler single-cavity tools, or 6–10 weeks for multi-cavity, overmold, side-action or tight-tolerance medical tools.
-
DFM Checklist Before Tooling: What to Freeze Before Steel Is Cut
Threegon Team
Freeze walls, draft, undercuts, gates, materials and approvers before steel is cut. A DFM checklist for designers and brand owners preparing tooling.
-
How to Vet a China OEM / Contract Manufacturer: A Buyer’s Checklist
Threegon Team
Procurement checklist for vetting a China OEM: confirm the factory, verify ISO and audits, NDA before files, in-house tooling questions, and quotes that separate tooling from unit cost.
-

Prototype to Production in China: Stages, Gates and Sign-Offs for Brand Owners
Threegon Team
Prototype to production in China, stage by stage: what you approve at each gate, what evidence to ask for, and where tooling time goes.
-

Manufacturing Partner for Industrial Designers: A Checklist for Your First Production Run
Threegon Team
New to production? A checklist for industrial designers choosing a manufacturing partner: DFM, tooling, IP, quality evidence, samples and costs.
-
First Visit to Shenzhen for Manufacturing: Practical Places and Tips for Startup Founders
Threegon Team
A short guide for first-time business travelers visiting Shenzhen to meet a factory, review samples, or discuss tooling. Focus on useful locations and logistics, not tourism.
-
Digital Records and AI-Assisted DFM in Plastic Product Development
Threegon Team
How structured process data and early digital reviews reduce iterations for OEM and ODM plastic projects.
Have a product ready to make?
Tell us about your product. We can sign an NDA before you share design files.